SCOPE: Replace Condensation Separation Vessel (CSV) To remove existing Condensate separation vessel(CSV). We disconnected all pipework from the existing CSV, unbolted from the concrete pad and lifted it out with…
SCOPE: Reinstall Food Production Line We received six semitrailer loads of equipment from interstate. The project was to unload and install the production line in 4 days, to allow other…
SCOPE: Install new wash pad To install a new wash pad, our first task was to remove a section of concrete guttering, which was lifted out with an excavator. Once…
SCOPE: Ultrasonically test all fuel rail and replace sections were wall thickness is below accepted levels. Once all pipework had been ultrasonically tested and reports were completed. New pipework was…
SCOPE: Upgrade of Nadi Weather Radar Tower Fabrication of metal work for tower upgrade. This consisted of the fabrication of steel strengthening sections as well as the fabrication of a…