SCOPE: Reinstall Food Production Line

We received six semitrailer loads of equipment from interstate.  The project was to unload and install the production line in 4 days, to allow other trades to come in behind us to install gas, power and water services to the line.  Our first task was to mark out the floor to ensure equipment was placed in the right area and only moved once.  As you can see, it was a tight fit, but we made it.  Installed on time and budget.